How Long Do Custom Uniforms Take to Make?

The Thread Yard Studio
Aug 23, 2026
3 min read

Most clubs underestimate this, and the ones who get caught out are almost never caught out by production. They are caught out by their own approval process.

The realistic timeline

Here is what actually happens, stage by stage.

Stage 1 — Brief to mockup: 24 hours

You send the sport, a rough count, your crest and the date. A designer draws your kit and emails it back. At The Thread Yard this is free and carries no obligation.

Stage 2 — Approval: 3 days to 3 weeks

This is where orders live or die. Production is predictable; committees are not.

You will go back and forth on the design — that is normal and revisions are unlimited and free. But you also need to collect a size list from every player, and that is the step that quietly consumes weeks.

Start collecting sizes the day you request the mockup. Do not wait until the design is signed off.

Stage 3 — Pre-production sample, optional: 5 to 10 days

On orders over 50 pieces we can make one physical garment for you to hold before the full run. It adds time but removes essentially all risk on a large order.

For smaller runs, a high-fidelity digital mockup does the same job.

Stage 4 — Production: 10 to 21 days

The actual making. Cut-and-sew takes longer than decorating blanks because the garment is built from fabric rather than bought finished.

Roughly:

  • Decorated blanks — 7 to 10 days
  • Cut-and-sew kit — 14 to 21 days

Stage 5 — Shipping: 2 to 7 days

Depends on destination and service.

Working backwards from your first fixture

If your season starts on 1 September, the calendar looks like this:

| Milestone | Date | |---|---| | Kit needed in hand | 25 August | | Ships | 20 August | | Production starts | 1 August | | Design approved and sizes collected | 28 July | | First mockup requested | mid-July at the latest |

And that assumes approval takes a week. If your club needs a committee meeting to sign anything off, add two more weeks and start in June.

Where delays actually come from

In order of how often they bite:

  1. Waiting for sizes. Someone always misses the form. Chase early.
  2. Design indecision. Unlimited revisions are genuinely unlimited, but each round adds days. Agree internally who has the final word before you start.
  3. Artwork problems. A low-resolution crest has to be redrawn. Send the best file you have on day one.
  4. Late payment of the deposit. Production is scheduled when the deposit clears, not when the design is approved.
  5. Actual production. Rarely the problem.

The one thing that saves you money and stress

Order early. A rush fee exists because your order has to jump a queue that other clubs are already in. Two extra weeks of lead time costs nothing and removes the fee entirely.

If you are reading this in June about a September season, you are in good shape. If you are reading it in August, send the brief today and tell us the deadline — we will tell you honestly whether it is achievable rather than take the order and hope.